Hawaiian Electric — which acted promptly to revive ability on the island after Aug. 8 — hauled absent fallen poles, energy strains, transformers, conductors together with other equipment from in the vicinity of a Lahaina substation beginning around Aug. Generators, UPS, and the switchboard needs to be inspected. For the https://fire-investigation90122.acidblog.net/57525543/little-known-facts-about-fire-investigation