1

The 2-Minute Rule for fire rated ductworth

News Discuss 
Smoke leakage (S): Failure of the criterion shall have transpired In case the circulation charge in duct A throughout the test exceeds ten m³ / (m² h), connected with 20 °C and 1013 mbar, related to The inner floor location from the duct In the furnace. Nondirectional fiber orientation aids https://fireratedductworth80011.blogdanica.com/36884119/the-basic-principles-of-fire-rated-insulation-for-ductworth

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story