Project Highlight At a prominent confectionery site in York, Newsome has implemented a high-capacity 400 kW chiller, marking the noteworthy execution of the project. Designed to strengthen ESG targets, the installation enhances process efficiency while lowering overall energy usage and CO₂ discharge. https://sitesrow.com/story10660773/advanced-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving